Sunday, February 17, 2008

New House Pictures

Ok, So it doesn't seem like we got alot done lately, because we haven't. We discovered that we need this two lovely steel posts in our basement and you cannot for some reason just go and buy them here in Washington, you have to have them made. Well, after a week or so of talking with people we finally found out that the guy that Troy coaches with would make them for us. We then had to wait another week and a half to have them made. We were then able to have Troy and Cal put them in (they are very heavy). Then we were able to start with the in floor heating. This task has taken us several weeks as well as we had to all wait for the plumber to be available to help us and direct us on what to do( imagine that Troy busy!!!). With his schedule we were only able to work at night and on the weekends and then...... he got sick. So he was in bed for a few days and we were waiting for him to recoup. We finally finished and called for inspection which was then four days out. So we were then blessed with and inspector that has never seen insultarp before and is requiring specs on it. I was able to get those specs and recall for inspection again. Guess what.... they are now a week out for them to inspect, so we now wait for wednesday and hope that everything passes and we can move ahead and have a little more exciting pictures than tubes and steel pipes. Sorry for the long story but that is where we are at.... way behind!!!!!!!!!!!!!

Love Ya All Nancy and Troy




1 comments:

The Hudkins Family said...

Are you planning on putting infloor heating on the main floor? I'm interested in how it is installed and WHAT IF THERE IS A LEAK? I want to install infloor heating in the retirement home we build at Camp Creek (in 5-6 years). Do you have a good website I can checkout? It is sure alot of work I don't envy you guys, I think I'll hire someone to build our next house! I'll post some pics mon or tues. I scanned some old 35mm pics.

Love,

Brent.